NEWS

Nausori Highland Road Closure For Urgent Maintenance

Due to the urgency, works will be carried out today (18th February) from 7am  to 8pm. Fiji Roads Authority would like to advise members of the public that FRA and
18 Feb 2018 11:54
Nausori Highland Road Closure For Urgent Maintenance

Due to the urgency, works will be carried out today (18th February) from 7am  to 8pm.

Fiji Roads Authority would like to advise members of the public that FRA and its Contractor has identified urgent maintenances repairs required to be undertaken on the FRA asset Nausori Highland 2 Bridge (Timber Deck Bridge).

The bridge is located approximately 24.823km from Nadi Bypass Road; approx. 3.54km pass Nausori Village and approx. 2.4km from Natawa Rd/ Bukuya Rd/ Nausori Highland Rd intersection. (Refer to map)

The repairs works will include the removal and replacement of deteriorated timber deck parts.

Due to the urgency, works will be carried out today (18th February) from 7am to 8pm. (Anticipated Low Volume during this time)

The appropriate TMP will be in place while the bridge repairs will be undertaken.

There are no safe detours around this section of road, therefore there will be a waiting period of 10-15mins or for at least 10 vehicles before opening lane at each interval during the above stated hours.

Travelers along this area are advised to take this notice into account when finalising travel plans. We apologise for the expected inconvenience.

Fijisun E-edition
Advertise with fijisun
Subscribe-to-Newspaper
Fiji Sun Instagram
Fiji Plus
Subscribe-to-Newspaper
error: