NATION

Maintenance Work Scheduled For Waidra Bridge, Baulevu, Nausori

Maintenance work on Waidra Bridge on Baulevu Road in Nausori will begin from next week. The Fiji Roads Authority (FRA) would like to advise members of the public, especially travellers
22 Sep 2018 10:00
Maintenance Work Scheduled For Waidra Bridge, Baulevu, Nausori
A map for the scheduled maintenance work on Waidra Bridge on Baulevu Road in Nausori that will begin next week

Maintenance work on Waidra Bridge on Baulevu Road in Nausori will begin from next week.

The Fiji Roads Authority (FRA) would like to advise members of the public, especially travellers along Waidra Bridge on Baulevu Road that the Bridge will be closed for maintenance work from:

  • 8:00pm, Tuesday September 25, to
  • 6.00am Wednesday September. 26.

During this time, access will be prohibited across the bridge and there will be no detours posted.

Works on the bridge include removing and replacing of damaged nailing strip, transverse planks and damaged running boards.

Bridge closure signs have been posted in advance of the closure period and motorists are requested to plan their travel accordingly.

FRA has advised that they have standby vehicles available on both sides of the bridge to cater for any emergency.

FRA stated that they wish to complete these urgent repairs as quickly and safely as possible.

“We apologise for the expected inconvenience. For further queries please call the FRA on 5720.”

Feedback: jyotip@fijisun.com.fj

Fiji Sun Instagram
Fiji Plus
Subscribe-to-Newspaper
error: